What we do, in detail

Four things, with the rate settled before the first invoice.

Program 01 · Where the rate matters

Demolition and reconstruction

On a project of this kind the VAT rate is usually the single largest variable a client controls, and it is decided by paperwork rather than by building. Six per cent instead of twenty-one is fifteen points of the whole contract, and it depends on conditions about the dwelling and on a declaration lodged before the tax becomes chargeable. Lodged late, the rate is gone for everything already invoiced. So this is the first conversation rather than a detail for later.

  • Per project
  • Private clients
  • Rate established first
  • Adviser confirms

Start this program

Step 1 · Regime

Which one the project falls under.

Step 2 · Conditions

Surface, domicile, sole dwelling.

Step 3 · Declare

Lodged before any VAT falls due.

Step 4 · Build

Invoiced at the rate that applies.

Step 1 · Drawings

Read closely, questions asked early.

Step 2 · Programme

Honest, with dependencies named.

Step 3 · Build

Changes recorded as they arise.

Step 4 · Handover

Snags listed rather than left.

Program 02 · Code 41.001

Residential construction

For works needing a permit the architect's involvement is required by law and the architect supervises the execution, which is exactly why that role cannot sit with the builder. We say so before being asked for an all-in package nobody may lawfully supply. Our part is to build what has been designed, raise early what the drawings did not anticipate, and record the answers before carrying on rather than at the end.

  • Per project
  • Private clients
  • Architect independent
  • Decennial insurance

Start this program

Program 03 · Code 68.122

Project development

The useful work in development happens before anything is bought, and it usually consists of establishing what a site will not support. Permitted use, access, services capacity and the time a permit will realistically take decide whether a project exists at all, and they are cheap to check against a plan and expensive to discover afterwards. A conclusion that a site does not work is a successful piece of development work.

  • Per project
  • Non-residential projects
  • Feasibility first
  • No permit promised

Start this program

Step 1 · Site

What the location actually permits.

Step 2 · Programme

Realistic timings, including the permit.

Step 3 · Numbers

Including the case for stopping.

Step 4 · Proceed

Or recommend against it, in writing.

Step 1 · Facts

The dwelling, the surface, the use.

Step 2 · Regimes

Which could apply, and which cannot.

Step 3 · Adviser

Questions written out for them.

Step 4 · Lodged

Declaration held before invoicing.

Program 04 · Not tax advice

Getting the position settled

Two reduced-rate regimes are regularly confused: demolition and reconstruction, and renovation of a dwelling at least ten years old. They have different conditions and an answer under one proves nothing about the other. What happens here is factual rather than advisory: we set out which regime a project would engage, what the conditions require, and what has to be lodged and when. The answer itself comes from your own tax adviser, and we do not invoice at the reduced rate without the declaration.

  • With every project
  • Private clients
  • Written summary
  • Adviser confirms

Start this program

A rebuild in mind, or a site you are unsure about?

A free first conversation, with no obligation. On a rebuild we will set out the VAT position before anything else.